Final Day of bridge
›
Today is the day of our final. We have most people outside. A lot of people are in the water. The goal is to finish the bridge, and make it ...
Friday, May 16, 2014
Building a Bridge Day 4
›
Today is officially the last class that we will be working on the 100ft bridge across the pond. Though we will be working on it on monday to...
Build A Bridge Progress Report #5 (D Block)
›
Today was our very last class day to make it, the next time we meet we will be putting the bridge in the water and Mr.Joslin will walk on it...
Thursday, May 15, 2014
Day 3: F block
›
Today we are doing a few different things. A few people are outside measuring the pond every five feet to get a better sense of what we ...
Wednesday, May 14, 2014
Building A Bridge Progress Report #4 (D Block)
›
Today we finished making the 10 frames with the wood going acrossed it to walk and started to put the slats together. Mr.Joslin went to the ...
Monday, May 12, 2014
Building a Bridge: Progress Report #3 (D block)
›
Today we were able to build the remaining frames and manipulate the materials we already possessed; so far, we are succeeding in staying wit...
Friday, May 9, 2014
Building A Bridge: Day 2: F block
›
Today is day two of the Building a Bridge project. From last class we have learned that our original design of the pier bridge and the float...
Building a Bridge: Progress Report #2 (D block)
›
After some hard work we were able to improve significantly the stability of a single module, by adding two barrels and creating a new frame ...
Wednesday, May 7, 2014
Building a Bridge: Introduction and Progress Report #1 (D block)
›
Mr. Joslin's Applied Physics D and F Block classes have been challenged to complete a whole new project: building a modular bridge acros...
›